Enugu building material prices
Best prices found·Mon 19 Oct 2026·16 of 25 materials
A vendor’s quote on the date shown. Prices move during the week — we quote at the price on the day we buy.
| Material | Best priceMon 19 Oct 2026 |
|---|---|
| Cement Dangoteper 50kg bag | ₦12,000no change · 12 Oct |
| Cement BUAper 50kg bag | ₦12,000no change · 12 Oct |
| Cement Lafarge Supasetper 50kg bag | ₦12,000no change · 12 Oct |
| Cement Unicemper 50kg bag | ₦12,100no change · 12 Oct |
| Cement Mangalper 50kg bag | ₦12,000no change · 12 Oct |
| Iron rod 12mm TMTper 12m length | ₦12,000no change · 12 Oct |
| Iron rod 12mm IGSper 12m length | ₦9,500no change · 12 Oct |
| Iron rod 16mm TMTper 12m length | ₦21,000no change · 12 Oct |
| Iron rod 16mm IGSper 12m length | ₦16,000no change · 12 Oct |
| Iron rod 10mm TMTper 12m length | ₦9,000no change · 12 Oct |
| Iron rod 10mm IGSper 12m length | ₦8,000no change · 12 Oct |
| Iron rod 8mm TMTper 12m length | ₦6,000no change · 12 Oct |
| Iron rod 8mm IGSper 12m length | ₦5,000no change · 12 Oct |
| Iron rod 6mm TMTper 12m length | ₦3,500no change · 12 Oct |
| Iron rod 6mm IGSper 12m length | ₦2,000no change · 12 Oct |
| Block 9-inchper piece | Awaiting collection |
| Block 6-inchper piece | Awaiting collection |
| Block 5-inchper piece | Awaiting collection |
| Block Solid 9-inchper piece | Awaiting collection |
| Sharp sandper trip | Awaiting collection |
| Graniteper trip | Awaiting collection |
| Gravelper trip | Awaiting collection |
| Plaster sandper trip | Awaiting collection |
| Roofing sheet 0.45 gaugeper metre | Awaiting collection |
| Binding wireper 20kg roll | ₦30,000no change · 7 Sept |
Buying materials?
Send us your list and we will quote it. We source from vendors we have priced and visited in person, and nothing is bought until you approve it.
WhatsApp us for a materials quoteEmail us for a materials quoteWhat this is
Every Monday we ask a set of building material vendors in Enugu what they are charging. Some we visit, some we call. This page shows the best price we were quoted for each material that week.
It is a record of what we were told on the day. It is not a catalogue, and nothing here is an offer — prices move, and a vendor who quoted on Monday may quote differently on Thursday.
How to read it
- Best price
- The best quote we received that week, per unit. Not an average.
- Change
- Against the same material last week. A rise is shown in red because it costs you more; a fall in green. A material we priced for the first time says so rather than showing a change of zero.
- Awaiting collection
- A material we follow, that we did not manage to get a price for that week. We would rather say so than leave it off the page and let the list look complete.
What to do next
If you are buying, use these figures to sanity-check a quote you have been given. If the number you were quoted is well above the price here, ask why.
If you want us to do the buying, we are a procurement company: we source from vendors we have priced and visited in person, you approve every purchase before we buy, and we document the delivery with photos. Our service fee is a flat figure set by the size of the order, from ₦25,000, charged on materials only. It is always a separate line item, nothing is added to the vendor’s price, and it is fixed when we send the quote.
Our minimum order is ₦200,000 of materials. Below that we do not quote. Quotes themselves are free.
Prices by category: Cement·Rods·Blocks & aggregates·Roofing